kaiyun体育在线登陆入口(China)官方网站

| | English 前, 要设定延迟翻译时间, 如100表示100ms,默认为0 var cookieDomain = "//hyu2902120001.my3w.com/"; //Cookie地址, 一定要设定, 通常为你的网址 var msgToTraditionalChinese = "繁體"; //默认切换为繁体时显示的中文字符 var msgToSimplifiedChinese = "简体"; //默认切换为简体时显示的中文字符 var translateButtonId = "translateLink"; //默认互换id translateInitilization();

INFOVISION OPTOELECTRONICS (KUNSHAN) CO., LTD.

date:2018-01-26    browser:169
IVO FAB 1A Array clean room
Construction period: August ~December 2005
Total floor area: 108,907 m2
Area of clean room area: 37,500 m2
Class of clean room: Class 10/100/1K/10K
IVO LCM2 Phase II Clean Room Engineering & Secondary Distribution Engineering
Construction period: August~September 2009
Total floor area: 108,907 m2
Area of clean room: 3,800 m2
Class of clean room: Class 100/10K
 

Foucs

Copyright © 2018 by lkeng. All rights reserved. Tel 86-512-67027000